- Pneumatic Angle Grinder
- Pneumatic Cleaning Gun
- Pneumatic Drill
- Pneumatic Driven Winch
- Pneumatic Grease Gun
- Pneumatic Heavy Duty Rotary Drill
- Pneumatic Hacksaw
- Pneumatic Hand Scaler KC-20
- Pneumatic Impact Wrench 1/2'', 3/4''
- Pneumatic Impact Wrench 1''
- Pneumatic Needle Scaler AMJ-16
- Pneumatic Needle Scaler AMJ-20
- Pneumatic Needle Scaler AMJ-24
- Pneumatic Needle Scaler AMJ-28
- Pneumatic Piston Pump
- Pneumatic Scaling Hammer
- Pneumatic Vacuum Cleaner
Contact Us
Shanghai Allmarine Industry Co.,Ltd.
16-58 Chenbao Road, Malu Industry Park, Jiading Dist., Shanghai City,China.
Tel +86 21-59152099
Fax +86 21-59152055
Fax +86 21-59152055
Email: sales@allmarine.com.cn
Electric high-pressure airless paint sprayer organ machine steps
4/27/2012 7:22:16 PMWARNING: Because this equipment is high-pressure device, Therefore, during operation, please read the Notes on operating instructions and warning labels before proceeding:
Electric high-pressure airless paint sprayer organ machine steps
Step one, before the device plugged in, the first really perform the following four steps:
To determine the suction tube and return tube connected to the correct position and tighten tight and fixed, followed by 15 m long high pressure paint hose and airless spray gun is connected to the other end of the paint tube
Pressure control valve to control the stress-free location (machine counterclockwise rotation a little bit)
Set the power switch in the "off" position
The oil at the entrance to drop 5-6 drops of oil
Step 2, use a multimeter measure the voltage to determine the voltage of 200-250 volts
Step 3 Connect the power cord in at least away from the spray District 7.5 meters and has a grounded power, the device is placed in a lit area, in order to prevent overspray caused by the inhalation device of the free particles in the air, in the circumstances permit , recommend the use of plastic canvas spray area will be isolated, the extension cord should not be too long (up to 90 meters), and not to secretly remove the power plug of the power line.
Step four, in accordance with the recommendations of the parameters of the coating supplier to paint reconcile, used filters in the coating of paint flakes and impurities filter out impurities in the coating and paint flakes will block the gun and under the rigid body, even when serious resulting in damage to the equipment
Step 5, the suction tube and return tube into the paint bucket, and the return valve is set in the returning position (counter clockwise)
Steps to open the device power and pressure control knob slowly pressure increased to medium pressure, and make the paint circulation within the device until the device all the air from the return pipe to discharge up
Step 7 Hold the spray gun grips, open the gun insurance, and at gunpoint paint bucket Tongbi after deduction of the trigger, while the backflow valve tighten (clockwise rotation) so that the spray of paint from the gun until the paint tube and gun all the air is expelled, release the trigger and close the gun insurance, will add pressure to the maximum
Step eight various parts of the inspection equipment with or without drip phenomenon, if, in accordance with the "relief program to relieve pressure and then tighten the drip site
Step 9 If there is no trickle down phenomenon, then shut the power switch, and return valve set to relieve pressure in the location of the backflow
Step 10, gun insurance is off the case, nozzle and nozzle jacket to install and tighten gun
Step 11, to open the power switch and return valve clockwise tighten
Step 12, pull the trigger and observe the spray rate, and slowly increase the pressure until the pieces until completely atomized.