Contact Us

Shanghai Allmarine Industry Co.,Ltd.
 
16-58 Chenbao Road, Malu Industry Park, Jiading Dist., Shanghai City,China.
 
Tel +86 21-59152099
Fax +86 21-59152055
 
         allmarine@126.com
 
 
 

Response to the hose fitting leak problem analysis

4/26/2012 7:57:42 PM
Response to the hose fitting leak problem analysis
How to deal with the leak of stainless steel hose fittings leaking
And we talk about the leaked metal quick coupling  discharge. If the metal hose on test encountered hose leaked to getting people a headache. Analysis on this issue and the next.
The first metal hose at the factory have been tested: the hose pressure testing, leakage, leak testing, pressure testing and so on. Each month a few thousand to tens of thousands, ranging from metal hose responsible for each enterprise workers, and perhaps there will be individual metal hose forget the perfunctory process of testing or testing. This is what we call slip through the net.
The metal hose connector at the disclosure of the reasons are as follows: an elastic joints withheld, resulting in a gap, or withhold joints into the unclean objects. 2 connector itself, when operating in the metal hose fittings lathe turner deviations and so on minors is expected. 3, the connector on the machine test the installation process, the connector installation time, internal lathe when the car left the wire wire strip body lead to not tighten the connector internal Jieshang Qu in the joints, to view the internal gasket when the pad is good, whether supporting and so on.