Contact Us

Shanghai Allmarine Industry Co.,Ltd.
 
16-58 Chenbao Road, Malu Industry Park, Jiading Dist., Shanghai City,China.
 
Tel +86 21-59152099
Fax +86 21-59152055
 
         allmarine@126.com
 
 
 

Wilden pump demolition process

5/7/2012 6:30:29 PM

Wilden pump demolition process

First. prior to the demolition of wilden pump, the air chamber and liquid chamber in the left and right sides were marked with a mark to contribute to subsequent re-assembly of the action.

Second.wrench to connect the outlet tube and the liquid chamber clamp release, removing the outlet pipe to see the ball and seat, took out the ball and seat and check the pump spare parts for wear, chemical corrosion, cracks, etc. phenomenon.

Third.Use a wrench to connect the inlet tube and the liquid chamber clamp release, the removal of the outlet pipe to see the ball and seat, took out the ball and seat and check the pump spare parts for wear, chemical corrosion, cracks, etc. phenomenon.

Fourth.Use the wrench to separate the intermediate fluid chamber and pump, remove the liquid chamber to see the diaphragm and the diaphragm plywood.

Fifth. left and right edges of the outer plywood using a tool or wrench diaphragm, the diaphragm, and intermediates separately. Clockwise rotation then release the diaphragm device. Out of the patch outside the plywood, the shaft removed from the intermediate.

Sixth. Clamp (padded wood) shaft separated from the diaphragm device, check the shaft, plywood, and the diaphragm for damage and corrosion phenomena.

Seventh. Wilden pump installation process from Step 6 to Step 1.

Allmrine products are good&cheap,especially quick coupling,ventilation fans and airless paint sprayer.Welcome you visit.