- Pneumatic Angle Grinder
- Pneumatic Cleaning Gun
- Pneumatic Drill
- Pneumatic Driven Winch
- Pneumatic Grease Gun
- Pneumatic Heavy Duty Rotary Drill
- Pneumatic Hacksaw
- Pneumatic Hand Scaler KC-20
- Pneumatic Impact Wrench 1/2'', 3/4''
- Pneumatic Impact Wrench 1''
- Pneumatic Needle Scaler AMJ-16
- Pneumatic Needle Scaler AMJ-20
- Pneumatic Needle Scaler AMJ-24
- Pneumatic Needle Scaler AMJ-28
- Pneumatic Piston Pump
- Pneumatic Scaling Hammer
- Pneumatic Vacuum Cleaner
Contact Us
Shanghai Allmarine Industry Co.,Ltd.
16-58 Chenbao Road, Malu Industry Park, Jiading Dist., Shanghai City,China.
Tel +86 21-59152099
Fax +86 21-59152055
Fax +86 21-59152055
Email: sales@allmarine.com.cn
Protective measures before airless paint sprayer spraying work
5/8/2012 6:26:37 PMProtective measures before airless paint sprayer spraying is very important.
1, in order to prevent pollution and damage in the process of spraying plaster works has been completed, should be used to shelter materials, and wrapped. Used tools and equipment should not impact protection facilities.
2, steel wooden doors, window frames should be taken to block, prevent spray sticky mortar.
3, aluminum, plastic, color galvanized steel doors and windows should be pasted plastic tape protection.
4, water supply and drainage, heating, gas piping, should be wrapped in protective plastic sheeting and other materials; intensive pipe should be installed after spraying plaster.
Concealed fire boxes, electrical switch boxes and cartons, place the equipment, etc. should be taken to cover protection to prevent dirt mortar.
6, a variety of pipe, line pipe should be kept unobstructed exposure Department should be temporarily closed to prevent access to the mortar.
7, the installation of stainless steel, copper handrail, plastic handrail fence, advanced wood handrails, plastic tape or plastic sheeting wrapped to protect, to prevent the dirt.
In the ground floor has been well laid roofing layer-transport pipe to prevent the joints of iron-damaged building, the ground surface layer and waterproof layer under the joints of iron bedding of wood or thick rubber pad. Do its ground floor, application of plastic sheeting and other materials covered in the ceiling, the walls before spraying. Cement mortar, the ground floor strength is not high, not the application of sand cover. Ground surface to prevent damage to the floor, you should clear the floor gray. Not the use of iron tools to crash the ground floor.
The leveling layer of mortar sprayer spray, rain mouth should do a good job protection, to avoid the mortar plug rainwater pipes.
10, floor drain and set aside the hole should be pre-closed to prevent access to the mortar, and make a mark.
11, ground floor, walls, ceiling has the deformation joint, before spraying application of wood and other materials do block retaining deformation joint, to prevent mortar injected into joints.