Contact Us

Shanghai Allmarine Industry Co.,Ltd.
 
16-58 Chenbao Road, Malu Industry Park, Jiading Dist., Shanghai City,China.
 
Tel +86 21-59152099
Fax +86 21-59152055
 
         allmarine@126.com
 
 
 

Spraying machinery and equipment of the pipeline

5/17/2012 11:20:23 PM
Spraying machinery and equipment of the pipeline
A airless paint sprayer equipment pipeline should be extremely resistant, safe and reliable pressurization process should not be damaged fracture occurs. The level of input slurry pipeline pressure wear-resistant rubber tube should be selected; vertical-transport tube can be used to pressure wear rubber or steel pipes.
Lose slurry pipe layout and installation should be smooth and straighten without bending, coiling, and compression. Lose slurry pipe connections should be used anchored, locking self-locking quick connector locking rod tied with wire. Pipe connections should be sealed, do not drain the syrup dripping. Lose slurry pipeline piping should be conducive to the parallel cross-flow process, reducing the demolition of the number of the tube was in the construction process.
3, horizontal, slurry pipe, long distance, plumbing should have a certain pitch up slope. Vertical-transport pipe must be firmly fixed to the wall or scaffolding. The connection between the level of input slurry pipe and vertical transmission and slurry pipe not less than 90 °, the bend radius shall be not less than 1.2m.
4 Pipeline steel pipe, the inner wall to keep clean and free of sticky material. Pipe at both ends with rubber tube should be securely connected, reliable seal, no leak of plasma phenomena.
5, when spraying, drag pipe bend radius shall be not less than 1.2m. Lose slurry pipe exports may not insert mortar.
6, the gas pipeline should select the location of soft rubber tracheal gas pipeline connection to the spray gun should be properly sealed and not leak.
7, the gas pipeline road should be smooth, double air seal on the trachea should be good, no air leaks.